Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Oct 15, 2021     11-2 Empennage Attach step 1-4 - (2 hours)       Category: Tail Feathers
Positioning and securing the horizontal stabilizer required some time in order to get a good result. We (Lucio and I) decided slightly modify the indication provided by VANS.
1. We secured the Horizontal Stabilizer to the retractable part of the bench using clamps and the screws but with a slightly different setup for the 11/32 wooden shim.
2. we used two wooden planks to secure the elevators in trail position.
The rest of the activities is as indicated. Thanks to Lucio who fabricated a new bushing using a lathe...my attempt using the drill press were acceptable but the lathe allows a perfect fabrication.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.